ABC member Capstone Green Energy Corporation, announced today that its Direct Solution Sales Team received a contract for a Capstone Signature Series C1000S system to operate grid-connected on biogas at a wastewater treatment facility in Central America. The new system, currently slated to be commissioned in November 2021, is expected to allow the site to reduce the amount of electricity needed to be purchased from the local utility. As a biogas-based system, the configuration will capture the methane produced by the anaerobic digesters and use it to fuel the C1000S system. More >>